Hyperscale data centers typically consume between 100-250 MW of power. A 1 GW (1000 MW) AI training cluster is 3-10x the power consumption of today's largest data centers. We need to increase the amount of power into data centres. Alot.
1.1. On-site Power Generation
1.2. Grid Upgrades and Ultra-High Voltage (UHV) Networks
1.3. Power Delivery